国产在线观看精品一区二区三区91,久久久久亚洲AV成人片乱码,91无码精品久久久一区,精品人妻一区二区三区久久动漫,国产一级久久久av毛片,欧美人与牲动交XXXX,日韩无码啪啪片,真人一级a爱做片免费

Search

UNT-MCS-600

智能電機保護測試儀可以與不同的操控模擬器配合使用,針對UNT-MMI系列產品進行全面、高效、準確的進行各項功能測試。為用戶在進行回路檢修或測...

UNT-ECS2000 plant power mo...

The Electric Automation System (ECS) of the power plant is a new integ...

UNT-CMII communication man...

The UNT-CMII communication management machine is the communication man...

UNT-EAP intelligent arc pr...

UNT-EAP intelligent arc protection series is a new generation of intel...

UNT-MMI-B intelligent MCC ...

The product is mainly used in the control circuit of low-voltage motor...

UNT-MMI-B-S智能MCC控制保護管理裝置

產品主要用于低壓電動機控制回路中,實現對電動機的各種保護、監測及控制功能,并能通過現場總線,實現對電動機回路的遠程監控。

Case
  • 國網公司石家莊公司弧光保護科技項目

      國家電網公司“新型配網開關設備防護技術的研究與應用”科技項目順利通過驗收

            2015年4月19日,我公司承擔的國家電網公司科技項目-“新型配網開關設備防護技術的研究與應用”通過了國家電網公司單位領導及業內知名專家的聯合驗收。通過項目匯報答疑與現場考察,與會專家一致認為,該項目完成了規定的研究內容,同意通過驗收,智能電弧光保護系統的研究成果在開關柜弧光保護方面達到了國內先進水平。
            本次項目的實施和驗收,進一步驗證了UNT-EAP智能電弧光保護系統為實現中低壓開關柜保護提供了一個理想的弧光保護解決方案,并得到了國家電網公司高度認可。

    設備應用:

    弧光保護主單元:UNT-EAP-2100      2                     

    弧光采集單元:UNT-EAP-2200       2  

    饋線保護單元:UNT-EAP-3000      8  

     

     

  • Jiangsu Banshan Power Generation ...

     The planned capacity of Bishan Power Plant is 3200MW. The company adopts ultra-supercritical power generation technology (the main parameters are 25MPa/600 C/600 C) and two-cylinder two-exhaust steam turbine technology, and simultaneously constructs flue gas desulfurization and denitrification devices, which represent the international advanced level and are one of the most efficient and clean coal-fired power generation projects in China.

    The project of Bishan Power Plant has purchased one set of UNT-ECS2000 auxiliary power monitoring system, 32 UNT-CMII communication managers, more than 1300 UNT-PCK intelligent PC measuring and controlling devices and UNT-MMI motor protectors. Among them, the communication network adopts the way of double network redundancy. The integrated protection equipment of high and low pressure, such as PC section of steam turbine, PC section of boiler and common section of two units, is brought into the electric monitoring system. Through the use of our company's auxiliary electrical monitoring system, greatly improve the automation of power plant operation, to ensure the economic, safe, reliable and stable operation of auxiliary power system.

    After more than ten years of operation in Banshan Power Plant, the user feedback device runs steadily and functions normally. Considering the service life of electronic equipment, users have carried out product upgrading in recent years. For the recognition of the company's products, users continue to choose our products.

    Equipment applications:

    Subsidiary Power Monitoring System: UNT-ECS2000 1 Sets

    Communication Manager: UNT-CMII 32

    Protective measurement and control device:

    UNT-MMI 858; UNT-PCK 340; UNT-PT 26; UNT-LOGO 17, etc.

  • Shandong Weiqiao Aluminum Electri...

     

    Shandong Weiqiao Aluminum & Electric Co., Ltd. is located in Zouping Economic Development Zone. It is a private enterprise integrating heat and power aluminum industry. Established in December 2002, it is a large-scale integrated enterprise integrating thermal power, alumina, electrolytic aluminum and aluminum deep processing. It is composed of a thermoelectric company with an installed capacity of 30-350MW and an annual output of 10 million tons of alumina and 250,000 tons of electrolysis. Aluminium aluminum company.

     

    Since 2009, Weiqiao Aluminum Power Project has purchased more than 1,000 sets of monitoring systems, communication management machines and motor protectors. Among them, the communication network adopts the dual network redundancy mode. One way of communication is Modbus@RTU, and the way of communication is Profibus_DP. Equipment connected to the monitoring system includes motor protectors, meters, frequency converters, circuit breakers, and the like. Through the use of our company's electrical and electrical monitoring system, the automation of power plant operation is greatly improved, and the plant power system is guaranteed to be economical, safe, reliable and stable.

    Equipment application:
    Factory power monitoring system: UNT-ECS2000 5 sets
    Communication management machine: UNT-CMII 88 sets
    Motor protector:
    UNT-MMI more than 10,000 units

  • Guotou Jinneng Beijiang Power Pla...

    Equipment application:

    Intelligent MCC control protection management device: UNT-MMI-B 623

    Intelligent PC monitoring and control device: UNT-PCK 254 sets

    Intelligent PT monitoring device: UNT-PT 55

    Dual power switching device: UNT-PT 38 units